Current Road Projects |
|||
Application | Name | From | To |
Double Bituminous Seal Coat & Slurry Seal | Redwood Drive (TR-502) | Sylvan/Laurel Drive | Laurel/Sylvan Drive |
Double Bituminous Seal Coat & Slurry Seal | Sylvan Drive (TR-501) | Buttonwood Drive | Redwood Drive |
Double Bituminous Seal Coat & Slurry Seal | Laurel Drive (TR-500) | Buttonwood Drive | Redwood Drive |
Double Bituminous Seal Coat & Slurry Seal | Buttonwood Drive (499) | Laurel Drive | Mud Lane |
Double Bituminous Seal Coat & Slurry Seal | All Segments East Allen Gardens | ||
Double Bituminous Seal Coat & Slurry Seal |
Snow Hill Road (TR 472) (Segments 10 & 20) |
Howertown Road (SR 3017) |
Old Carriage Road (SR 3018) |
CP2 & Single Bituminous Seal Coat |
Valley Road (TR 473) (Segments 10,20,30,& 40) |
Kreidersville Road (SR 4003) |
Twinbrook Road (TR 477) |